While we don't have written instructions for them since they are designed to be pretty self explanatory, here is a rundown of the setup:
- You should have multiple display pieces, each with its own male plug somewhere on the frame
- You should also have a 2,3 or 4 channel chase controller (depending on how many pieces are included in your animation)
- Place the display pieces where you want them to be placed - and in animation sequence order
- Using standard extension cords (household cords work fine as does making your own using SPT1 wire and plugs), plug the first display piece into channel 1 on the controller, plug the second display piece into channel 2 on the controller and plug the third display piece into channel 3 on the controller, etc...
- using standard extension cord, plug the male plug end of the 2/3/4 channel light controller to your nearest power source/outlet
- use the speed control dial on the front of the 2/3/4 channel chase controller to set the speed of the display piece animation to your preference.
That's it! Easy Peasy!